Timing matters

Bring BARAQ in before the electrical design is closed

Ideally even before that point. This is when it is easiest to decide what should work together, what should be automated and what needs to be prepared so the whole home works as one system later on.

How the project usually moves

When is the right time to involve us

You do not need every detail selected yet. The important thing is to speak with us before the electrical design is finalised and before individual systems start being solved one by one.

Best time

We help most at the plans stage, before the electrical design. Once the rough-in starts, changes usually become more expensive and more difficult.

Walk through the build step by step in 3D 
  1. 1

    Plans

    Best time

    Plans in hand, before the electrical design

    We talk through what you expect from the house or flat, what you want to control and what should run on its own. Then we mark where the switches, sensors, cables and the space in the distribution board will go. Everything is still open and nothing has to be redone.

    What we do: Consultation, plan

    New build
    Best right at the start, while the first important decisions are made and the electrical design is still being drawn.
    Renovation
    Best before demolition or before the first walk-through with the electrician.
  2. 2

    Foundations

    Almost everything is still open

    We clarify which technologies should be connected: heating, shading, ventilation, entry or metering. We choose them so that one system can control them, before each one is ordered on its own.

    What we do: Choosing technologies

    New build
    A good moment to think about heating, shading, ventilation, entry and metering as one whole.
    Renovation
    Especially important when several things are being replaced at once and should work well together.
  3. 3

    Shell

    Still good, the lighting plan closes now

    Cabling can still be adjusted and we design the system around the house as it is built. Every light needs its own cable, though, so the lighting plan has to be closed before the rough-in starts.

    What we do: Choosing lights

    New build
    This is when you decide where the light goes and what kind: downlights, a strip above the counter, a light over the table or on the terrace.
    Renovation
    During demolition and building work, new cable routes and light positions can still be agreed.
  4. 4

    Rough-in

    The last comfortable moment

    The electrician pulls the cables to the plan: the bus to every module, power to the lights and sockets, everything into one distribution board. You can still check on site that nothing is missing, but changes already cost more time and money.

    What we do: Cabling plan

    New build
    Good for a final check of sensors, controls and space in the distribution board.
    Renovation
    The last comfortable moment to prepare important routes and places before everything is covered again.
  5. 5

    Plaster and fit-out

    Still possible, but harder

    Plaster hides the runs, and after the painters the modules go in, which we register with the ioMASTER controller. A cable missing now can usually only be added by opening the wall. Work on 230 V is always done by a qualified electrician.

    What we do: Modules and set-up

    New build
    The modules go in on the cables already prepared. Whatever was missing from the plan is harder to add now.
    Renovation
    Late changes can already mean reopening walls or changing the agreed scope.
  6. 6

    Handover

    Now it is about finishing, not rethinking

    We commission the system, set up the scenes and walk you through the app and the wall controls. Once you have moved in, we fine-tune everything to how you actually live. You can also come to us with a finished home; it just costs more and the scope is smaller. We will tell you straight what makes sense.

    What we do: Commissioning

    New build
    At this point the earlier preparation pays off.
    Renovation
    Comfort can still improve, but bigger changes are now more limited.

What is worth solving together

Some things are best planned together from the start

Lighting, heating, cooling, ventilation, blinds, entry, security or energy metering all affect what needs to be prepared in the wiring. If they are solved late or one by one, unnecessary limits appear.

What is usually worth planning together

  • Lighting scenes
  • Heating and cooling
  • Ventilation and air quality
  • Shading
  • Access and security
  • Audio and intercom
  • Energy metering
  • EV charging and reserves
  • The right wiring gets prepared

    It becomes clear what should be prepared in the walls, in the cabinet and for future upgrades.

  • The chosen devices work well together

    We help make sure the selected technologies can be connected and controlled in a sensible way.

  • The whole home works like one system

    Lighting, heating, shading and the rest can follow the same logic, so daily living feels simpler and more natural.

When we start in time

What you gain by starting early

We can still help later. But when we are part of the project from the start, you keep more options, avoid extra work and get one system that makes sense as a whole.

  • Less extra work

    Cables, the distribution board and devices are prepared once, to one plan. Nothing has to be reopened or redone later.

    No work on finished walls or the board.

  • More options

    With the cables in place, automatic features are possible that would later lack the preparation.

    The result is more comfortable and cleaner.

  • Easier connections

    Devices chosen to one shared plan work together and are controlled from one place.

    One place to control everything instead of several apps.

It still makes sense to bring us in later. It is simply true that the earlier you call, the more options you keep.

What would it cost for your home?

You can estimate the price for your home in a few minutes. Or write to us and we will go through it together.

Still a while before you build?

Sign up for our news, and get in touch when the electrical design comes up.

At most once a month: new features and modules, articles and offers. Unsubscribe with one click. Privacy policy